
|
|
Point to Point - Pneumatic Tube Systems GENERAL INFORMATION Control unit is usually placed close to the blower unit, 110 V. System is activated by pressing the sending button (on wall close to station). Stations are linked to the control unit. Low voltage is used . Pressing on a sending button, vacuum or pressure is built into system (depending which station is sending). This will allow carrier to be transported from a station to the other. When we press on a sending button, a timer and the blower units are activated. As timer has completed its cycle, blower units are turned off. Predetermined time must allow carrier to reach destination. Time is manually adjustable. USERS INSTRUCTIONS - To open, slide sleeve. - If pressure in station, WAIT, a carrier is heading towards your station. - When station is open, you can introduce carrier in conduit (for cap carriers, cap up). - Send only one carrier. - Slide sleeve down. - Press on sending button. RECEPTION When you have received a carrier. - Every station can receive carriers in vertical conduit up to the ceiling. - Slide sleeve up. If you feel a resistance, wait until the blower stops. Take carrier out. - Slide sleeve down, to close station. - Always keep station closed, it ensures soft landing of carriers. OPTION Photoelectric switch also available. |
It's now possible to add a surveillance computer on this system to watch simulteniously what usage is made of the system and all the historic of transactions. |
![]() |
![]() |
![]() |
![]() |
Last changes 05/04/07 09:26




